Updated: January 16, 2017

LIST OF PUBLICATIONS AND PRESENTATIONS OF T. HOLCZINGER

29 Holczinger, T., M. Hegyhati, and F. Friedler, Simultaneous Heat Integration and Batch Process Scheduling, Chemical Engineering Transactions, 29, 337-342 (2012).
28 Holczinger, T., M. Hegyháti, and F. Friedler, Simultaneous heat integration and batch process scheduling, presented at PRES 2012, Prague, Czech Republic, Aug 25-29, 2012.
27 Hegyhati, M., T. Holczinger, and F. Friedler, In-Depth Study and Comparison of S-Graph Framework and Precedence Based MILP Formulations for Batch Process Scheduling, presented at AIChE Annual Meeting, Minneapolis, MN, U.S.A., October 16-21, 2011.
26 Hegyhati, M., T. Holczinger, A. Szoldatics, and F. Friedler, Combinatorial Approach to Address Batch Scheduling Problems with Limited Storage Time, Chemical Engineering Transactions, 25, 495-500 (2011).
25 Hegyhati, M., T. Holczinger, A. Szoldatics, and F. Friedler, Combinatorial Approach to Address Batch Scheduling Problems with Limited Storage Time, presented at the PRES'11 (14th International Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction), Florence, Italy, May 8-11, 2011.
24 Holczinger, T., M. Hegyháti, and F. Friedler, S-graph as an integrated modeling and optimization tool for the scheduling of industrial batch processes, presented at the VOCAL 2010 (Veszprém Optimization Conference: Advanced Algorithms), Veszprém, Hungary, December 13-15, 2010.
23 Hegyháti, M., T. Majozi, T. Holczinger, and F. Friedler, Practical infeasibility of cross-transfer in batch plants with complex recipes: S-graph vs MILP methods, Chemical Engineering Science, 64, 605-610, (2009).
22 Hegyhati, M., T. Majozi, T. Holczinger, F. Friedler, Practical Feasibility of Mathematical Models in Scheduling, presented at the VOCAL 2008 (Veszpém Optimization Conference: Advanced Algorithms), Veszprém, Hungary, December 15-17, 2008.
21 Majozi, T., T. Holczinger, and F. Friedler, Implications of cross-transfer in batch plants with complex recipes: S-graph vs MILP methods, presented at the PRES 2008 (11th Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction), Praha, Czech Republic, August 24-28, 2008.
20 Holczinger, T., T. Majozi, and F. Friedler, Optimal scheduling of batch plants with complex recipes, presented at the PRES 2008 (11th Conference on Process Integration, Modelling and Optimisation for Energy Saving and Pollution Reduction), Praha, Czech Republic, August 24-28, 2008.
19 Majozi, T., F. Friedler, T. Holczinger, and M. Hegyhati, S-graph based continuous-time approach for throughput maximization in multipurpose batch plants, presented at the IFORS 2008 (International Federation of Operational Research Societies Conference), Sandton, South-Africa, July 13-18, 2008.
18 Adonyi, R., G. Biros, T. Holczinger, and F. Friedler, Effective scheduling of a large-scale paint production system, Journal of Cleaner Production, 16 (2), 225-232 (2008).
17 Hegyhati, M., T. Holczinger, T. Majozi, and F. Friedler, Transforming STN based scheduling problems to S-graph representation, presented at the XIX Polish Conference of Chemical and Process Engineering, Rzeszów, Poland, September 3-7, 2007.
16 Adonyi, R., T. Holczinger, T. Majozi, and F. Friedler, Novel branching procedure for S-graphs based scheduling of batch processes, presented at the XIX Polish Conference of Chemical and Process Engineering, Rzeszów, Poland, September 3-7, 2007.
15 Holczinger, T., T. Majozi, M. Hegyhati, and F. Friedler, Throughput Maximization in Multipurpose Batch Plants: S-graph vs. Time Point Based Methods, presented at the PRES'07, ISCHIA Island Gulf of Naples, Italy, June 24-27, 2007.
14 Holczinger, T., T. Majozi, M. Hegyhati, and F. Friedler, An Automated Algorithm for Throughput Maximization Under Fixed Time Horizon in Multipurpose Batch Plants: S-Graph Approach, presented at the ESCAPE-17, Bucharest, Romania, May 27-30, 2007, also published in Computer Aided Chemical Engineering, 24, 649-654.
13 Holczinger, T., T. Majozi, M. Hegyhati, and F. Friedler, Using S-graph Approach for Throughput Maximization in Multipurpose Batch Plants, presented at the VOCAL 2006, Veszprém, Hungary, December 13-15, 2006.
12 Majozi, T., T. Holczinger, R. Adonyi, F. Friedler, Maximization of throughput over a fixed time horizon using a recently developed S-graph approach: A pharmaceuticals case study, presented at the PRES 2006, Praha, Czech Republic, August 27-31, 2006.
11 Hegyhati, M., R. Adonyi, T. Holczinger, F. Friedler, Demonstration program for S-graph based batch-process scheduling, presented at the PRES 2006, Praha, Czech Republic, August 27-31, 2006.
10 Nadal, S. F., T. Holczinger, C. A. Mendez, F. Friedler, and L. Puigjaner, Rigorous scheduling resolution of complex multipurpose batch plants: S-graph vs. MILP, presented at the ESCAPE-16, Garmisch-Partenkirchen, Germany, July 9-13, 2006.
9 Holczinger, T., G. Biros, F. Friedler, and N. Sarkozi, Acceleration tools for batch process scheduling, presented at the CHISA 2004 (16th International Congress of Chemical and Process Engineering), Praha, Czech Republic, August 22-26, 2004.
8 Romero, J., L. Puigjaner, T. Holczinger, and F. Friedler, Scheduling Intermediate Storage Multipurpose Batch Plants Using the S-Graph, AIChE J., 50(2), 403-417 (2004).
7 Holczinger, T., J. Romero, L. Puigjaner, and F. Friedler, Scheduling of Multipurpose Batch Processes with Multiple Batches of the Products, Hung. J. Ind. Chem., 30, 305-312 (2002).
6 Romero, J., T. Holczinger, F. Friedler, and L. Puigjaner, Modelling the Scheduling of Common Intermediate Storage Multipurpose Batch Process Using a Graph Theoretical Approach, presented at the AIChE Annual Meeting, Indiana, U.S.A., November 7, 2002.
5 Sanmarti, E., T. Holczinger, L. Puigjaner, and F. Friedler, Combinatorial Framework for Effective Scheduling of Multipurpose Batch Plants, AIChE Journal, 48(11), 2557-2570 (2002).
4 Holczinger, T., I. Heckl, A. C. Kokossis, and F. Friedler, Accelerated contextual optimization for scheduling large-scale HPC liquid factories, presented at the AIChE Annual Meeting, Reno, NV, U.S.A., November 4-9, 2001.
3 Holczinger, T., L. Kalotai, and F. Friedler, Scheduling of Process Systems Comprising Continuous and Batch Operations, presented at the CHISA 2000 (14th International Congress of Chemical and Process Engineering), Praha, Czech Republic, August 27-31, 2000.
2 Holczinger, T., L. Kalotai, and F. Friedler, Scheduling of Process Systems Comprising Continuous and Batch Operations, presented at the 20th Workshop on Chemical Engineering Mathematics, Veszprem, Hungary, July 26-29, 2000.
1 Holczinger, T., F. Friedler, and L. T. Fan, Process Synthesis for Retrofit Design, presented at the CHISA '98 (13th International Congress of Chemical and Process Engineering), Praha, Czech Republic, August 23-28, 1998.


To T. Holczinger's main page